Information to resolve the H795 inspection
o H795 inspection required = The project proposes to install potable water infrastructure and services for a proposed hotel at 2030 Element Drive (parcel 015-220-68).
-----------------------------------------------------------
To resolve the H795 inspection, the applicant or primary contact or contractor shall email the following information to ehsplanreview@washoecounty.us: ----------
>>> Documentation from the water company affirming that construction is complete and complies with regulatory standards. ----------
>>> The passing backflow test report for the single 4-inch domestic RPPA backflow, the single 1.5-inch irrigation RPPA backflow and the single 6-inch fire DCDA backflow assembly โ here is an example of a backflow test report ---------- https://tmwa.com/wp-content/uploads/docs/Customer_Services/Backflow/TEST_FORM_20080421.pdf. ----------
>>> Photographs showing that the single 4-inch domestic RPPA backflow, the single 1.5-inch irrigation RPPA backflow and the single 6-inch fire DCDA backflow assembly are installed. ----------
>>> If the design on the plans change, the as-built construction documents showing the changes. ----------
Include permit number BLD20-05786 and an explanation in the subject line of the email.
----------------------------------------------------------
Use this link to schedule a construction inspection with the Health District = https://forms.washoecounty.us/f/PermitInspectionRequest ----------
Use this email to resolve a construction inspection that is scheduled with the Health District = ehsplanreview@washoecounty.us -----------
https://nvbpels.org/pdfs/2020-BLUE-BOOK.pdf
Applied | Notice | 12/08/2020